即时比分篮球

13478868877
Home page Product center
product quality
Price Description
After sales service
Plant equipment
success case
Leave message
about us
contact us
product quality
H

product quality

Position: Home > Product Quality

Drawing cabinet process requirements

Release time: 2017/07/27

1. The steel plate is fully degreased, cleaned with pure water, heated to remove oil and phosphating, metering, and drying processes, so that the product has stronger rust resistance and longer life.
2. Large sheet metal equipment, composite molds, special tool holders, the product processing process does not fall to the ground. Parts are punched in one pass, with high accuracy and versatility. The welding part adopts high standard fusion welding, and the surface is smooth and smooth;
3. Fully automatic spraying line, electrostatic powder spraying on the surface (combination of manual and automatic line spraying, uniform coating, strong adhesion), international brand Akzo powder conforming to EU ROHS standards, making the product truly environmentally friendly and harmless.
4. This product is free for life maintenance (except for fake), free delivery in Beijing area, and pay the payment if you are satisfied with the acceptance (if you are dissatisfied, return it free of charge).
5. This product should be inspected by the National Quality Supervision and Inspection Center.